Gloucester Service Station

Constructed between 2014 and 2015, Gloucester Service Station was built with great care and a broad vision to fit within the surroundings of an Area of Outstanding Natural Beauty and rich wildlife.

This case study highlights how even smaller-scale ‘hard’ infrastructure projects can achieve award winning status for their contribution to biodiversity, the landscape, and for stimulating the local economy.

Click here to view the case study.

The rear view of the service station (Photo: Westmorland Ltd)

 

More: Case studies | Background to ecological assessment | Wildlife Assessment Check tool